ALTER SUBDIVISION- CONSISTENCY 1000 Taylors Lane, (Section 4 Block 77, Lot 14), Consistency for a proposed 3 lot subdivision located at 1000 Taylors Lane in the R-15 District
805, 817- 819 MAMARONECK AVENUE -CONSISTENCY 805, 817-819 Mamaroneck Avenue (Section 8, Block 21,Lots 228 & 233), Subdivision and Site plan for redevelopment/new construction of retail shops along Mamaroneck Avenue. The proposal seeks to combine two sites: the first site (2.23 acres) contains a vacant 25,377 square foot retail building, previously occupied by A&P supermarket. The second site (0.113 acres) contains a vacant three-story residential apartment building. These two parcels will be combined in the Subdivision (merger) process. The new building will consist of five single story retail units totaling approximately 11,975 square feet in floor area in the C-1 district.
JEFFREY & VICTORIA MAGGARD- CONSISTENCY 8 Oak Lane, (Section 9, Block 92, Lot 8) , Consistency for a Wetlands Permit to construct an addition to a single family home, a new in ground swimming pool, remove the existing asphalt tennis court, replace existing septic tank and associated site work in the R-20 District.
ORIENTA BEACH CLUB - SITE PLAN-PRELIMINARY REVIEW 1054 Walton Avenue Site Plan (Section 9, Block 98, Lot 1) Application to relocate an existing platform tennis court, add an additional court, add a new Warming hut and decking and install storm water recharging system (MR District)
2E. DISCUSSION: West Basin Pump Station in Harbor Island Park. Proposed upgrades and construction by Westchester County Department of Environmental facilities. 5. ADJOURN MEETING
ALTER SUBDIVISION- CONSISTENCY 1000 Taylors Lane, (Section 4 Block 77, Lot 14), Consistency for a proposed 3 lot subdivision located at 1000 Taylors Lane in the R-15 District
805, 817- 819 MAMARONECK AVENUE -CONSISTENCY 805, 817-819 Mamaroneck Avenue (Section 8, Block 21,Lots 228 & 233), Subdivision and Site plan for redevelopment/new construction of retail shops along Mamaroneck Avenue. The proposal seeks to combine two sites: the first site (2.23 acres) contains a vacant 25,377 square foot retail building, previously occupied by A&P supermarket. The second site (0.113 acres) contains a vacant three-story residential apartment building. These two parcels will be combined in the Subdivision (merger) process. The new building will consist of five single story retail units totaling approximately 11,975 square feet in floor area in the C-1 district.
JEFFREY & VICTORIA MAGGARD- CONSISTENCY 8 Oak Lane, (Section 9, Block 92, Lot 8) , Consistency for a Wetlands Permit to construct an addition to a single family home, a new in ground swimming pool, remove the existing asphalt tennis court, replace existing septic tank and associated site work in the R-20 District.
ORIENTA BEACH CLUB - SITE PLAN-PRELIMINARY REVIEW 1054 Walton Avenue Site Plan (Section 9, Block 98, Lot 1) Application to relocate an existing platform tennis court, add an additional court, add a new Warming hut and decking and install storm water recharging system (MR District)
2E. DISCUSSION: West Basin Pump Station in Harbor Island Park. Proposed upgrades and construction by Westchester County Department of Environmental facilities. 5. ADJOURN MEETING